INSP - Final | 8/15/1995 | 8/15/1995 | 8/15/1995 | | PASS |
|
|
|
CORRECTIONS MADE INSTLLATION OK FINAL 16 MIN
|
INSP - Final | 8/14/1995 | 8/14/1995 | 8/14/1995 | | FAIL |
Alan Hauser
|
|
|
NO FINAL
|
INSP - Framing/ Rough-in | 7/25/1995 | 7/25/1995 | 7/25/1995 | A | PASS |
Alan Hauser
|
|
|
r/i ok 15 min
|
INSP - Gas pressure test | 7/25/1995 | 7/25/1995 | 7/25/1995 | A | PASS |
Alan Hauser
|
|
|
#26186 furn. and w/h. 15 min.
|