INSP - Final | 9/29/1995 | 9/29/1995 | 9/29/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FINAL
|
INSP - Final | 8/16/1995 | 8/16/1995 | 8/16/1995 | | NR |
Alan Hauser
|
|
|
$20 REINSPECTION FEE
|
INSP - Gas pressure test | 7/31/1995 | 7/31/1995 | 7/31/1995 | P | PASS |
Alan Hauser
|
|
|
gas test ok #26196 20 min
|
INSP - Framing/ Rough-in | 7/26/1995 | 7/26/1995 | 7/26/1995 | A | PASS |
Alan Hauser
|
|
|
corrections were made. no gas piping has been done yet. 20 min
|
INSP - Framing/ Rough-in | 7/25/1995 | | 7/25/1995 | | FAIL |
|
|
|
7/25 - REINSPECTION FEE CORRECTIONS NOT MADE
|
INSP - Framing/ Rough-in | 7/24/1995 | 7/24/1995 | 7/24/1995 | | FAIL |
|
|
|
CORRECTIONS GAS NOT DONE 20 MIN
|