INSP - Final | 10/23/1995 | 10/23/1995 | 10/23/1995 | P | CANC |
Carl Dependahl
|
|
|
10/23/95 340 - THIS IS IN ALANS AREA Done by David.
|
INSP - Final | 10/23/1995 | 10/23/1995 | 10/23/1995 | P | CANC |
Carl Dependahl
|
|
|
10/23/95 340 - THIS IS IN ALANS AREA Done by David.
|
INSP - Final | 10/23/1995 | 10/23/1995 | 10/23/1995 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 8/1/1995 | 8/1/1995 | 8/1/1995 | P | PASS |
Alan Hauser
|
|
|
corrections were made and approved. 20 min
|
INSP - Framing/ Rough-in | 7/31/1995 | 7/31/1995 | 7/31/1995 | P | FAIL |
Alan Hauser
|
|
|
need: draft stop at attic penetration and maintain 1" clearance on bw vent. 20 min
|
INSP - Gas pressure test | 7/31/1995 | 7/31/1995 | 7/31/1995 | P | PASS |
Alan Hauser
|
|
|
gas piping to wall furnace approved. #26195 15 min.
|