INSP - Final | 8/17/1995 | 8/17/1995 | 8/18/1995 | P | PASS |
Dave Lightfoot
|
|
|
08/17/95 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 | A | FAIL |
Dave Lightfoot
|
|
|
NEED COMBUSTION AIR FOR 75,000 BTU/15 MIN
|
INSP - Framing/ Rough-in | 8/1/1995 | 8/1/1995 | 8/1/1995 | A | FAIL |
|
|
|
NO ACCESS/ MIN
|