INSP - Final | 9/8/1995 | 9/11/1995 | 9/11/1995 | A | PASS |
Alan Hauser
|
|
|
09/11/95 350 - FNL -OK FINAL
|
INSP - Final | 9/8/1995 | 9/11/1995 | 9/11/1995 | A | PASS |
Alan Hauser
|
|
|
09/11/95 350 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 8/3/1995 | 8/3/1995 | 8/3/1995 | A | PASS |
Alan Hauser
|
|
|
corrections made. r/i ok 15 min
|
INSP - Framing/ Rough-in | 8/2/1995 | 8/2/1995 | 8/2/1995 | A | FAIL |
Alan Hauser
|
|
|
NEED:R.A. FLEX NEEDS CHANGED AT BOTH ENDS TO TIGHT AND CHOKING OFF PIPE. 20 MIN
|
INSP - Gas pressure test | 8/2/1995 | 8/2/1995 | 8/2/1995 | A | PASS |
Alan Hauser
|
|
|
GAS OK #27996 20 MIN
|