INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 | | NR |
Alan Hauser
|
|
|
/ / 350 -
|
INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FNL -OK FINAL
|
INSP - Final | 8/25/1995 | 8/25/1995 | 8/25/1995 | P | NR |
Alan Hauser
|
|
|
08/25/95 350 - not ready check monday morning
|
INSP - Final | 8/25/1995 | 8/25/1995 | 8/25/1995 | P | NR |
Alan Hauser
|
|
|
08/25/95 350 - not ready check monday morning
|
INSP - Framing/ Rough-in | 8/3/1995 | 8/3/1995 | 8/3/1995 | P | PASS |
Alan Hauser
|
|
|
corrections were made on r.a. flex in attic. 20 min
|
INSP - Framing/ Rough-in | 8/2/1995 | 8/2/1995 | 8/2/1995 | A | FAIL |
Alan Hauser
|
|
|
NEED:SEAL AROUND COLLAR ON EXHAUST DUCT, RAISE R.A. FLEX 12" ABOVE BOTTOM OF TRUSSES. 15 MIN
|
INSP - Gas pressure test | 8/2/1995 | 8/2/1995 | 8/2/1995 | A | PASS |
Alan Hauser
|
|
|
GAS OK.#27989 15 MIN
|