INSP - Final | 9/21/1995 | 9/21/1995 | 9/21/1995 | A | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 8/15/1995 | 8/15/1995 | 8/15/1995 | A | PASS |
Dave Lightfoot
|
|
|
7 MIN
|
INSP - Framing/ Rough-in | 8/15/1995 | 8/15/1995 | 8/15/1995 | P | FAIL |
Dave Lightfoot
|
|
|
NEED 1/4" MESH FOR FA
|
INSP - Gas pressure test | 8/15/1995 | 8/15/1995 | 8/15/1995 | P | PASS |
Dave Lightfoot
|
|
|
25774/8 MIN
|
INSP - Framing/ Rough-in | 8/14/1995 | 8/14/1995 | 8/14/1995 | A | FAIL |
Dave Lightfoot
|
|
|
NEED INSULATION CLEARANCE IN ATTIC AND NEED FA DUCT/15 MIN
|