INSP - Final | 9/14/1995 | 9/14/1995 | 9/14/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/14/95 337 - FNL -OK FINAL
|
INSP - Final | 9/14/1995 | 9/14/1995 | 9/14/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/14/95 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 8/16/1995 | 8/16/1995 | 8/16/1995 | A | PASS |
Dave Lightfoot
|
|
|
10 MIN
|
INSP - Gas pressure test | 8/16/1995 | 8/16/1995 | 8/16/1995 | A | PASS |
Dave Lightfoot
|
|
|
25775/10 MIN
|