INSP - Final | 9/12/1995 | 9/12/1995 | 9/12/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/12/95 337 - FNL -OK FINAL
|
INSP - Final | 9/12/1995 | 9/12/1995 | 9/12/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/12/95 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 8/17/1995 | 8/18/1995 | 8/18/1995 | A | PASS |
Dave Lightfoot
|
|
|
08/17/95 337 - RGHN-OK ROUGH IN
|
INSP - Gas pressure test | 8/17/1995 | 8/18/1995 | 8/18/1995 | A | PASS |
Dave Lightfoot
|
|
|
08/17/95 337 - GP -OK GAS PIPING
|