INSP - Final | 8/31/1995 | 8/31/1995 | 8/31/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FNL -OK FINAL gas test was witnessed by gas company
|
INSP - Framing/ Rough-in | 8/31/1995 | 8/31/1995 | 8/31/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FURN-FURNACE OK
|
INSP - Water heater | 8/31/1995 | 8/31/1995 | 8/31/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - w/h ok
|
INSP - Conference | 8/30/1995 | 8/30/1995 | 8/30/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - meet with contractor about comb. air into furnace room.
|
INSP - Conference | 8/30/1995 | 8/30/1995 | 8/30/1995 | P | NR |
Alan Hauser
|
|
|
08/30/95 350 -
|