INSP - Final | 3/5/1996 | 3/5/1996 | 3/5/1996 | P | PASS |
|
|
|
03/05/96 326 - FIRST SECURITY Final ok. (Gen. Contr. to install firestops at all penetrations of floor by gas ve
|
INSP - Final | 3/5/1996 | 3/5/1996 | 3/5/1996 | P | PASS |
|
|
|
03/05/96 326 - FIRST SECURITY Final ok. (Gen. Contr. to install firestops at all penetrations of floor by gas ve
|
INSP - Framing/ Rough-in | 2/6/1996 | 2/6/1996 | 2/6/1996 | P | PASS |
|
|
|
02/06/96 326 - 3RD FLOOR BATHROOM Ductwork R/I ok (3rd fl. bathrooms).
|
INSP - Framing/ Rough-in | 1/24/1996 | 1/24/1996 | 1/24/1996 | P | PASS |
|
|
|
01/24/96 326 - SECOND FLOOR BATHROOMS Ductwork R/I ok.
|
INSP - Partial final | 1/22/1996 | 1/22/1996 | 1/22/1996 | P | PASS |
|
|
|
01/22/96 326 - TEMP OCC ON 1ST FLOOR Signed card for Temp. Occupancy for 1st Floor, West End only.
|
INSP - Framing/ Rough-in | 1/10/1996 | 1/10/1996 | 1/11/1996 | P | PASS |
|
|
|
01/10/96 326 - (2) range hood ducts R/I ok.
|
INSP - Framing/ Rough-in | 1/5/1996 | 1/5/1996 | 1/5/1996 | P | PASS |
|
|
|
01/05/96 326 - SHOWER AREA Shower Area ductwork R/I ok.
|
INSP - Framing/ Rough-in | 12/11/1995 | 12/11/1995 | 12/12/1995 | P | CANC |
Gerry Varner
|
|
|
12/11/95 323 - FOR THE HOOD
|
INSP - Framing/ Rough-in | 12/6/1995 | 12/6/1995 | 12/6/1995 | | PASS |
|
|
|
/ / 326 - Partial R/I ok (west bathrooms, 1st floor).
|
INSP - Framing/ Rough-in | 10/5/1995 | 10/5/1995 | 10/5/1995 | P | PASS |
Dave Lightfoot
|
|
|
10/05/95 337 - RGHN-OK ROUGH IN FOR HOOD EXHAUST DUCT
|