INSP - Final | 10/2/1995 | 10/2/1995 | 10/2/1995 | P | PASS |
Dave Lightfoot
|
|
|
10/02/95 337 - FNL -OK FINAL
|
INSP - Final | 10/2/1995 | 10/2/1995 | 10/2/1995 | P | PASS |
Dave Lightfoot
|
|
|
10/02/95 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 9/1/1995 | 9/1/1995 | 9/1/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Gas pressure test | 9/1/1995 | 9/1/1995 | 9/1/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - GP -OK GAS PIPING #27910
|