INSP - Final | 10/18/1995 | 10/18/1995 | 10/18/1995 | P | PASS |
Dave Lightfoot
|
|
|
10/18/95 337 - FNL -OK FINAL
|
INSP - Final | 10/18/1995 | 10/18/1995 | 10/18/1995 | P | PASS |
Dave Lightfoot
|
|
|
10/18/95 337 - FNL -OK FINAL
|
INSP - Gas pressure test | 9/12/1995 | 9/12/1995 | 9/12/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/12/95 337 - GP -OK GAS PIPING
|
INSP - Gas pressure test | 9/11/1995 | 9/12/1995 | 9/12/1995 | A | FAIL |
Dave Lightfoot
|
|
|
09/11/95 337 - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Gas pressure test | 9/8/1995 | 9/11/1995 | 9/11/1995 | A | FAIL |
Dave Lightfoot
|
|
|
09/08/95 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED TAPE PIPE NEED VALVE OUTSIDE FIRE PLACE
|
INSP - Framing/ Rough-in | 9/6/1995 | 9/7/1995 | 9/7/1995 | A | PASS |
Dave Lightfoot
|
|
|
09/06/95 337 - PRESSURE TEST NOT READY RGHN-OK ROUGH IN
|