INSP - Final | 10/25/1995 | 10/25/1995 | 10/25/1995 | P | PASS |
Dave Lightfoot
|
|
|
|
INSP - Final | 10/25/1995 | 10/25/1995 | 10/25/1995 | P | PASS |
Dave Lightfoot
|
|
|
|
INSP - Final | 10/24/1995 | 10/24/1995 | 10/24/1995 | P | PASS |
Dave Lightfoot
|
|
|
10/24/95 337 - FNL -OK FINAL
|
INSP - Final | 10/24/1995 | 10/24/1995 | 10/24/1995 | P | PASS |
Dave Lightfoot
|
|
|
10/24/95 337 - FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 9/8/1995 | 9/8/1995 | 9/8/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/08/95 337 - GP -OK GAS PIPING RGHN-OK ROUGH
|