INSP - Final | 1/30/1996 | 1/30/1996 | 1/30/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FINAL, RECEIVED A LETTER FROM C. M. WALSH MANAGER, EVALUATION ENGINEERIN STATING THAT THE 17" CLEARANCE ABOVE GAS COOKTOP WOULD BE WITHIN THEIR TEMPERATURE RANGE OF THE LIS
|
INSP - Final | 1/25/1996 | 1/25/1996 | 1/25/1996 | P | FAIL |
Dave Lightfoot
|
|
|
01/25/96 337 - PLEASE SIGN OFF THE 2ND FLOOR SUITE 1000 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 1/25/1996 | 1/25/1996 | 1/25/1996 | P | FAIL |
Dave Lightfoot
|
|
|
01/25/96 337 - PLEASE SIGN OFF THE 2ND FLOOR SUITE 1000 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 11/6/1995 | 11/6/1995 | 11/6/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ROUGH-IN IS OK
|
INSP - Framing/ Rough-in | 9/14/1995 | 9/15/1995 | 9/15/1995 | A | PASS |
Alan Hauser
|
|
|
09/14/95 350 - NWP -GENERAL INSPECTION - NO WORK IN PROGRESS TALKED WITH TIM FROM Y.M.C ABOUT PLANS FOR SPACE. HAVE ONLY HUNG THE FOUR HEAT PUMPS, NO WORK YET.
|