INSP - Final | 11/6/1995 | 11/7/1995 | 11/7/1995 | A | PASS |
Dave Lightfoot
|
|
|
11/06/95 337 - FNL -OK FINAL
|
INSP - Final | 11/6/1995 | 11/7/1995 | 11/7/1995 | A | PASS |
Dave Lightfoot
|
|
|
11/06/95 337 - FNL -OK FINAL
|
INSP - Gas pressure test | 9/26/1995 | 9/27/1995 | 9/27/1995 | A | PASS |
Dave Lightfoot
|
|
|
09/26/95 337 - GP -OK GAS PIPING
|
INSP - Gas pressure test | 9/25/1995 | 9/26/1995 | 9/26/1995 | A | FAIL |
Dave Lightfoot
|
|
|
09/25/95 337 - THEY ADDED A DRYER, FP, RANGE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 9/20/1995 | 9/20/1995 | 9/20/1995 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - GP -OK GAS PIPING RGHN-OK ROUGH
|