INSP - Final | 9/19/1995 | 9/20/1995 | 9/21/1995 | A | PASS |
Alan Hauser
|
|
|
09/20/95 350 - CHANGE OUT EXISTING ROOF TOP UNIT W/NEW NWP -GENERAL INSPECTION - NO WORK IN PROGRESS talked with contractor about seal wood in return air plenum.
|
INSP - Final | 9/19/1995 | 9/20/1995 | 9/21/1995 | A | PASS |
Alan Hauser
|
|
|
09/20/95 350 - CHANGE OUT EXISTING ROOF TOP UNIT W/NEW NWP -GENERAL INSPECTION - NO WORK IN PROGRESS talked with contractor about seal wood in return air plenum.
|