INSP - Final | 11/3/1995 | 11/3/1995 | 11/3/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FINAL
|
INSP - Final | 11/2/1995 | 11/2/1995 | 11/2/1995 | P | PASS |
Alan Hauser
|
|
|
|
INSP - Final | 11/2/1995 | 11/2/1995 | 11/2/1995 | P | PASS |
Alan Hauser
|
|
|
|
INSP - Gas pressure test | 9/22/1995 | 9/25/1995 | 9/25/1995 | A | CANC |
Alan Hauser
|
|
|
09/25/95 350 -
|
INSP - Framing/ Rough-in | 9/19/1995 | 9/20/1995 | 9/20/1995 | A | PASS |
Alan Hauser
|
|
|
09/20/95 350 - RGHN-OK ROUGH IN
|