INSP - Final | 10/31/1995 | 11/1/1995 | 11/1/1995 | A | PASS |
Alan Hauser
|
|
|
|
INSP - Final | 10/31/1995 | 11/1/1995 | 11/1/1995 | A | PASS |
Alan Hauser
|
|
|
|
INSP - Framing/ Rough-in | 9/19/1995 | 9/20/1995 | 9/20/1995 | A | FAIL |
Alan Hauser
|
|
|
09/20/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED BUILDING WAS SHEETROCKED BEFO COULD INSPECT THE ROUGH-IN NOTED THIS ON INSPECTION CARD
|