INSP - Final | 10/26/1995 | 10/27/1995 | 10/27/1995 | A | NR |
|
|
|
10/26/95 338 - THIS IS READY AT 11:00
|
INSP - Final | 10/26/1995 | 10/27/1995 | 10/27/1995 | A | NR |
|
|
|
10/26/95 338 - THIS IS READY AT 11:00
|
INSP - Final | 10/25/1995 | 10/26/1995 | 10/26/1995 | A | NR |
Dave Lightfoot
|
|
|
10/25/95 337 - RFC -REINSPECTION FEE CHARGED
|
INSP - Final | 10/25/1995 | 10/26/1995 | 10/26/1995 | A | NR |
Dave Lightfoot
|
|
|
10/25/95 337 - RFC -REINSPECTION FEE CHARGED
|
INSP - Framing/ Rough-in | 9/27/1995 | 9/27/1995 | 9/27/1995 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - RGHN-OK ROUGH IN
|
INSP - Rough-in & Gas Pressure | 9/25/1995 | 9/25/1995 | 9/25/1995 | P | PART |
Dave Lightfoot
|
|
|
09/25/95 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PI
|