INSP - Final | 12/12/1995 | 12/12/1995 | 12/12/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FINAL
|
INSP - Gas pressure test | 11/8/1995 | 11/9/1995 | 11/9/1995 | A | NR |
Alan Hauser
|
|
|
11/09/95 350 - PRESSURE TEST WAS NOT THERE, GAUGE WAS GONE
|
INSP - Framing/ Rough-in | 10/13/1995 | 10/13/1995 | 10/13/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ROUGH-IN IS OK
|
INSP - Framing/ Rough-in | 10/12/1995 | 10/12/1995 | 10/12/1995 | P | FAIL |
Alan Hauser
|
|
|
10/12/95 35O - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED REINSPECTION FEE CHARGED $20 for corrections not done from last inspecti G
|
INSP - Framing/ Rough-in | 10/10/1995 | 10/11/1995 | 10/11/1995 | A | FAIL |
Alan Hauser
|
|
|
10/10/95 350 - CALL US FOR DETAILS CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|