INSP - Final | 4/4/1996 | 4/5/1996 | 4/5/1996 | A | PASS |
Dave Lightfoot
|
|
|
04/04/96 337 - ACCESS GHI FNL -OK FINAL sign perm occ card
|
INSP - Final | 4/4/1996 | 4/5/1996 | 4/5/1996 | A | PASS |
Dave Lightfoot
|
|
|
04/04/96 337 - ACCESS GHI FNL -OK FINAL sign perm occ card
|
INSP - Framing/ Rough-in | 10/31/1995 | 11/1/1995 | 11/1/1995 | A | PART |
Dave Lightfoot
|
|
|
10/31/95 337 - REINSPECTION DCT -OK DIFFUSERS/DUCTWORK
|
INSP - Framing/ Rough-in | 10/10/1995 | 10/10/1995 | 10/10/1995 | P | FAIL |
Dave Lightfoot
|
|
|
10/10/95 337 - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 9/28/1995 | 9/28/1995 | 9/28/1995 | P | FAIL |
Dave Lightfoot
|
|
|
09/28/95 337 - BLDG #11-6 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|