INSP - Final | 11/9/1995 | 11/13/1995 | 11/13/1995 | A | PASS |
Dave Lightfoot
|
|
|
11/09/95 337 - FNL -OK FINAL
|
INSP - Final | 11/9/1995 | 11/13/1995 | 11/13/1995 | A | PASS |
Dave Lightfoot
|
|
|
11/09/95 337 - FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 10/4/1995 | 10/5/1995 | 10/5/1995 | P | PASS |
Dave Lightfoot
|
|
|
10/04/95 337 - READY PM GP -OK GAS PIPING RGHN-OK ROUGH IN
|