INSP - Final | 12/26/1995 | 12/27/1995 | 12/27/1995 | A | PASS |
Dave Lightfoot
|
|
|
12/26/95 337 - FNL -OK FINAL SIGN PERM OCC
|
INSP - Final | 12/26/1995 | 12/27/1995 | 12/27/1995 | A | PASS |
Dave Lightfoot
|
|
|
12/26/95 337 - FNL -OK FINAL SIGN PERM OCC
|
INSP - Rough-in & Gas Pressure | 11/29/1995 | 11/29/1995 | 11/29/1995 | P | PASS |
Dave Lightfoot
|
|
|
11/29/95 337 - THEY WANT A R/I AND A PARTIAL FINAL ON WING A. RGHN-OK ROUGH IN RI AREA A OK PARTIAL RI CORE AREA OK
|
INSP - Framing/ Rough-in | 9/29/1995 | 10/2/1995 | 10/2/1995 | A | PART |
Dave Lightfoot
|
|
|
09/29/95 337 - PARTIAL R/I AS PER PLANS AND SPECS104,429.00 RGHN-OK ROUGH IN duct work above ceiling
|