INSP - Final | 10/9/1995 | 10/9/1995 | 10/9/1995 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FNL -OK FINAL PIPE SIZE CHANGED TEST BY GAS CO
|
INSP - Gas pressure test | 10/5/1995 | 10/5/1995 | 10/5/1995 | P | NH |
Dave Lightfoot
|
|
|
10/05/95 337 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Gas pressure test | 10/4/1995 | 10/4/1995 | 10/4/1995 | P | FAIL |
Dave Lightfoot
|
|
|
10/04/95 337 - GAS PIPING TO RANGE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|