INSP - Final | 1/11/1996 | 1/12/1996 | 1/12/1996 | A | PASS |
Alan Hauser
|
|
|
01/11/96 350 - FINAL WAS DONE ON 12/22/95 ACCORDING TO MY RECORDS
|
INSP - Final | 1/11/1996 | 1/12/1996 | 1/12/1996 | A | PASS |
Alan Hauser
|
|
|
01/11/96 350 - FINAL WAS DONE ON 12/22/95 ACCORDING TO MY RECORDS
|
INSP - Framing/ Rough-in | 10/17/1995 | 10/17/1995 | 10/17/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ROUGH-IN IS OK CHECK ON COMBUSTION AIR SEPERATION LATER
|
INSP - Gas pressure test | 10/13/1995 | 10/13/1995 | 10/13/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - GAS PIPING OK #27231
|
INSP - Framing/ Rough-in | 10/11/1995 | 10/12/1995 | 10/12/1995 | A | CANC |
|
|
|
10/11/95 326 - Alan's area.
|
INSP - Framing/ Rough-in | 10/11/1995 | 10/11/1995 | 10/11/1995 | P | FAIL |
Alan Hauser
|
|
|
10/11/95 350 - r/i CORR-CORREC-CALL FOR REINSP WHEN COMPLETED PRESSURE TEST FAILED
|