INSP - Final | 11/29/1995 | 11/29/1995 | 11/29/1995 | P | PASS |
Dave Lightfoot
|
|
|
11/29/95 337 - FNL -OK FINAL
|
INSP - Final | 11/29/1995 | 11/29/1995 | 11/29/1995 | P | PASS |
Dave Lightfoot
|
|
|
11/29/95 337 - FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 10/26/1995 | 10/26/1995 | 10/26/1995 | P | PASS |
|
|
|
10/26/95 338 - RGHN-OK ROUGH IN gas test ok
|
INSP - Rough-in & Gas Pressure | 10/19/1995 | 10/20/1995 | 10/20/1995 | A | FAIL |
Dave Lightfoot
|
|
|
10/19/95 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|