INSP - Final | 12/15/1995 | 12/15/1995 | 12/15/1995 | P | PASS |
Dave Lightfoot
|
|
|
12/15/95 337 - FNL -OK FINAL
|
INSP - Final | 12/15/1995 | 12/15/1995 | 12/15/1995 | P | PASS |
Dave Lightfoot
|
|
|
12/15/95 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 11/7/1995 | 11/7/1995 | 11/7/1995 | P | PASS |
Dave Lightfoot
|
|
|
11/07/95 337 - RGHN-OK ROUGH IN
|
INSP - Gas pressure test | 11/1/1995 | 11/2/1995 | 11/2/1995 | A | PART |
Dave Lightfoot
|
|
|
11/01/95 337 - VENTING TO FURNACE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS TEST OK
|