INSP - Final | 12/19/1995 | 12/19/1995 | 12/19/1995 | P | PASS |
Alan Hauser
|
|
|
12/19/95 350 - REINSPECTION FINAL
|
INSP - Final | 12/19/1995 | 12/19/1995 | 12/19/1995 | P | PASS |
Alan Hauser
|
|
|
12/19/95 350 - REINSPECTION FINAL
|
INSP - Final | 12/15/1995 | 12/18/1995 | 12/18/1995 | A | FAIL |
Alan Hauser
|
|
|
12/15/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 12/15/1995 | 12/18/1995 | 12/18/1995 | A | FAIL |
Alan Hauser
|
|
|
12/15/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Rough-in & Gas Pressure | 11/3/1995 | 11/6/1995 | 11/6/1995 | A | PART |
Alan Hauser
|
|
|
11/03/95 350 - GAS PIPING OK #27304 ROUGH-IN IS OK BUT STILL NEED TO LOOK AT F/P WHEN FRAMED IN AND ALSO THE B-VENT FROM FURNACE
|