INSP - Final | 1/29/1996 | 1/29/1996 | 1/29/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FINAL
|
INSP - Final | 1/26/1996 | 1/29/1996 | 1/29/1996 | A | CANC |
Dave Lightfoot
|
|
|
01/29/96 337 - MON AM.
|
INSP - Final | 1/26/1996 | 1/29/1996 | 1/29/1996 | A | CANC |
Dave Lightfoot
|
|
|
01/29/96 337 - MON AM.
|
INSP - Final | 1/25/1996 | 1/25/1996 | 1/25/1996 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 11/7/1995 | 11/8/1995 | 11/8/1995 | A | PASS |
Alan Hauser
|
|
|
11/07/95 350 - STATEHOUSE INN FURNISH AND INSTALL HVAC FOR ELEVATOR WATE 10,725.00 ROUGH-IN IS OK TO MOVE TWO DRYER VENTS, THIS IS ALL THEY HAVE DONE AT TH POINT.
|
INSP - Final | 11/7/1995 | 11/8/1995 | 11/8/1995 | A | PASS |
Alan Hauser
|
|
|
11/07/95 350 - STATEHOUSE INN FURNISH AND INSTALL HVAC FOR ELEVATOR WATE 10,725.00 ROUGH-IN IS OK TO MOVE TWO DRYER VENTS, THIS IS ALL THEY HAVE DONE AT TH POINT.
|