INSP - Final | 12/19/1995 | 12/19/1995 | 12/19/1995 | P | PASS |
Dave Lightfoot
|
|
|
12/19/95 337 - FNL -OK FINAL
|
INSP - Final | 12/19/1995 | 12/19/1995 | 12/19/1995 | P | PASS |
Dave Lightfoot
|
|
|
12/19/95 337 - FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 11/14/1995 | 11/14/1995 | 11/15/1995 | P | PASS |
Dave Lightfoot
|
|
|
11/14/95 337 - GP -OK GAS PIPING RGHN-OK ROUGH
|