INSP - Final | 3/29/1996 | 3/29/1996 | 3/29/1996 | P | PASS |
Dave Lightfoot
|
|
|
03/29/96 337 - FNL -OK FINAL SIGN PERM OCC
|
INSP - Final | 3/29/1996 | 3/29/1996 | 3/29/1996 | P | PASS |
Dave Lightfoot
|
|
|
03/29/96 337 - FNL -OK FINAL SIGN PERM OCC
|
INSP - Partial final | 3/28/1996 | 3/28/1996 | 3/28/1996 | P | FAIL |
Dave Lightfoot
|
|
|
03/28/96 337 - EVERYTHING ABOVE THE CEILING CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 2/28/1996 | 2/28/1996 | 2/28/1996 | P | PASS |
Dave Lightfoot
|
|
|
02/28/96 337 - DAVE CAROL WOULD LIKE YOU TO CALL PAT AT ###-#### BEFORE GP -OK GAS PIPING RGHN-OK ROUGH IN
|
INSP - Gas piping | 2/26/1996 | 2/26/1996 | 2/26/1996 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS TEST FAIL NEED FIRE DAMPER ACCESS NEED TO LOCTITE UNION IN GAS PIPE
|
INSP - Gas piping | 2/26/1996 | 2/26/1996 | 2/26/1996 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS TEST FAIL NEED FIRE DAMPER ACCESS NEED TO LOCTITE UNION IN GAS PIPE
|
INSP - Framing/ Rough-in | 2/20/1996 | 2/21/1996 | 2/21/1996 | A | PART |
Dave Lightfoot
|
|
|
02/20/96 337 - REINSPECTION PLEASE CALL PAT WHEN READY ###-#### RGHN-OK ROUGH IN PART R/I MCDONALDS CHEVRON STORE ONLY
|
INSP - Duct work | 2/15/1996 | 2/15/1996 | 2/15/1996 | P | FAIL |
Dave Lightfoot
|
|
|
02/15/96 337 - UNIT 1 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Gas pressure test | 11/22/1995 | 11/24/1995 | 11/24/1995 | A | PASS |
Alan Hauser
|
|
|
11/22/95 350 - THANKS ALAN THIS IS FOR FRIDAY AM GAS PIPING OK TO THE CARWASH BUILDING, BOTH ENDS OF THE PIPE ARE VENTED OUTSIDE OF EACH BUILDING.
|
INSP - Gas pressure test | 11/22/1995 | 11/22/1995 | 11/22/1995 | P | FAIL |
Dave Lightfoot
|
|
|
11/22/95 337 - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED SIEEVE AND VENT NOT CORRECT
|
INSP - Gas pressure test | 11/20/1995 | 11/21/1995 | 11/21/1995 | A | FAIL |
Dave Lightfoot
|
|
|
11/20/95 337 - SEE ATTACHED SHEETS IN YOUR BOX CORR-CORREC-CALL FOR REINSP WHEN COMPLETED gas pipe is beiow slab
|