INSP - Final | 3/20/1996 | 3/20/1996 | 3/20/1996 | P | PASS |
Carl Dependahl
|
|
|
03/20/96 340 -
|
INSP - Final | 3/20/1996 | 3/20/1996 | 3/20/1996 | P | PASS |
Carl Dependahl
|
|
|
03/20/96 340 -
|
INSP - Gas pressure test | 3/20/1996 | 3/20/1996 | 3/20/1996 | P | PASS |
Carl Dependahl
|
|
|
03/20/96 340 - GAS TEST OK...FINALLY!
|
INSP - Gas pressure test | 3/19/1996 | 3/19/1996 | 3/19/1996 | P | CANC |
Carl Dependahl
|
|
|
03/19/96 340 - REINSPECTION CONTRACTOR CALLED TO CANCEL
|
INSP - Final | 3/18/1996 | 3/18/1996 | 3/18/1996 | P | FAIL |
Carl Dependahl
|
|
|
03/18/96 340 - REINSEPCTION
|
INSP - Final | 3/18/1996 | 3/18/1996 | 3/18/1996 | P | FAIL |
Carl Dependahl
|
|
|
03/18/96 340 - REINSEPCTION
|
INSP - Final | 3/14/1996 | 3/14/1996 | 3/14/1996 | P | CANC |
Dave Lightfoot
|
|
|
03/14/96 337 -
|
INSP - Final | 3/14/1996 | 3/14/1996 | 3/14/1996 | P | CANC |
Dave Lightfoot
|
|
|
03/14/96 337 -
|
INSP - Final | 3/13/1996 | 3/13/1996 | 3/13/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 -
|
INSP - Final | 3/13/1996 | 3/13/1996 | 3/13/1996 | P | CANC |
Dave Lightfoot
|
|
|
03/13/96 337 -
|
INSP - Final | 3/13/1996 | 3/13/1996 | 3/13/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 -
|
INSP - Final | 3/13/1996 | 3/13/1996 | 3/13/1996 | P | CANC |
Dave Lightfoot
|
|
|
03/13/96 337 -
|
INSP - Rough-in & Gas Pressure | 3/13/1996 | 3/13/1996 | 3/13/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 -
|
INSP - Final | 3/12/1996 | 3/12/1996 | 3/12/1996 | | NH |
Dave Lightfoot
|
|
|
/ / 337 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Final | 3/11/1996 | 3/11/1996 | 3/12/1996 | P | CANC |
Dave Lightfoot
|
|
|
03/11/96 337 - HE ADDED A EXTRA GAS LINE TO THIS FOR A RANGE.
|
INSP - Final | 3/11/1996 | 3/11/1996 | 3/12/1996 | P | CANC |
Dave Lightfoot
|
|
|
03/11/96 337 - HE ADDED A EXTRA GAS LINE TO THIS FOR A RANGE.
|
INSP - Gas pressure test | 3/11/1996 | 3/11/1996 | 3/12/1996 | P | CANC |
Dave Lightfoot
|
|
|
03/11/96 337 - ADDED THIS FOR THE RANGE
|
INSP - Final | 3/7/1996 | 3/7/1996 | 3/7/1996 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 3/6/1996 | 3/7/1996 | 3/7/1996 | A | CANC |
Carl Dependahl
|
|
|
03/06/96 340 -
|
INSP - Final | 3/6/1996 | 3/7/1996 | 3/7/1996 | A | CANC |
Carl Dependahl
|
|
|
03/06/96 340 -
|
INSP - Rough-in & Gas Pressure | 12/1/1995 | 12/1/1995 | 12/1/1995 | P | PASS |
|
|
|
12/01/95 326 - Gas Test done in AM. R/I correction made - installed corr combustion air ducts. R / I ok.
|
INSP - Rough-in & Gas Pressure | 11/30/1995 | 12/1/1995 | 12/1/1995 | A | PART |
|
|
|
12/01/95 326 - GAS LOG F/P IS ALSO INCLUDING THE PERMIT Gas Test ok - Tag #28607. R/I correction: Combustion air ducts must be metal - not flex duct. Fireplace ok.
|