INSP - Final | 1/24/1996 | 1/25/1996 | 1/25/1996 | P | PASS |
Dave Lightfoot
|
|
|
01/25/96 337 - REINSPECTION FNL -OK FINAL
|
INSP - Final | 1/24/1996 | 1/25/1996 | 1/25/1996 | P | PASS |
Dave Lightfoot
|
|
|
01/25/96 337 - REINSPECTION FNL -OK FINAL
|
INSP - Gas pressure test | 1/24/1996 | 1/24/1996 | 1/24/1996 | P | FAIL |
Dave Lightfoot
|
|
|
01/24/96 337 - THEY ADDED A GAS RANGGE ALAN INSPECTED THIS HAS CORRECTIONS
|
INSP - Framing/ Rough-in | 12/19/1995 | 12/19/1995 | 12/19/1995 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - RGHN-OK ROUGH IN R/I OK BY PERRY
|
INSP - Rough-in & Gas Pressure | 12/13/1995 | 12/13/1995 | 12/13/1995 | P | FAIL |
Dave Lightfoot
|
|
|
12/13/95 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS TEST OK
|