INSP - Rough-in & Gas Pressure | 12/29/1995 | 12/29/1995 | 12/29/1996 | P | PASS |
Dave Lightfoot
|
|
|
|
INSP - Final | 4/8/1996 | 4/8/1996 | 4/8/1996 | A | PASS |
|
|
|
mec final was completed 03-22-96 by #401
|
INSP - Final | 4/5/1996 | 4/8/1996 | 4/8/1996 | A | CANC |
|
|
|
transfer to 400 completed by #401 on 03-22-96
|
INSP - Final | 4/8/1996 | 4/8/1996 | 4/8/1996 | A | PASS |
|
|
|
mec final was completed 03-22-96 by #401
|
INSP - Final | 4/5/1996 | 4/8/1996 | 4/8/1996 | A | CANC |
|
|
|
transfer to 400 completed by #401 on 03-22-96
|
INSP - Final | 3/22/1996 | 3/22/1996 | 3/22/1996 | P | |
|
|
|
|
INSP - Final | 3/22/1996 | 3/22/1996 | 3/22/1996 | P | |
|
|
|
|
INSP - Framing/ Rough-in | 1/3/1996 | 1/3/1996 | 1/3/1996 | P | PASS |
Dave Lightfoot
|
|
|
01/03/96 337 - RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 1/2/1996 | 1/2/1996 | 1/2/1996 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PI
|