INSP - Framing/ Rough-in | 1/9/1996 | 1/9/1996 | 1/9/1996 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 1/8/1996 | 1/8/1996 | 1/8/1996 | P | FAIL |
Alan Hauser
|
|
|
01/08/96 350 - READY AT 11:00 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Rough-in & Gas Pressure | 1/2/1996 | 1/2/1996 | 1/2/1996 | P | PASS |
Dave Lightfoot
|
|
|
01/02/96 337 - GAS PIPING, GAS TEST, VENTING,DUCT WORK, FURNACE. GP -OK GAS PIPING
|