INSP - Final | 2/20/1996 | 2/20/1996 | 2/20/1996 | P | PASS |
Dave Lightfoot
|
|
|
02/20/96 337 - FNL -OK FINAL SIGN PERM OCC
|
INSP - Final | 2/20/1996 | 2/20/1996 | 2/20/1996 | P | PASS |
Dave Lightfoot
|
|
|
02/20/96 337 - FNL -OK FINAL SIGN PERM OCC
|
INSP - Rough-in & Gas Pressure | 1/4/1996 | 1/5/1996 | 1/5/1996 | A | PASS |
Dave Lightfoot
|
|
|
01/04/96 337 - REINSPECTION GP -OK GAS PIPING RGHN-OK ROUGH IN
|
INSP - Rough-in & Gas Pressure | 1/4/1996 | 1/4/1996 | 1/4/1996 | P | FAIL |
Dave Lightfoot
|
|
|
01/04/96 337 - COMPLETE HVAC SYSTEM AS PER PLANS AND SPECS ALL RELATED G VENTING-$7,197.00-BLD 95-0404 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|