INSP - Final | 3/7/1996 | 3/7/1996 | 3/7/1996 | P | FAIL |
Alan Hauser
|
|
|
03/07/96 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 3/7/1996 | 3/7/1996 | 3/7/1996 | P | FAIL |
Alan Hauser
|
|
|
03/07/96 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 3/4/1996 | 3/5/1996 | 3/5/1996 | A | FAIL |
Alan Hauser
|
|
|
03/04/96 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NEED TO REVENT RANGE HOODS
|
INSP - Final | 3/4/1996 | 3/5/1996 | 3/5/1996 | A | FAIL |
Alan Hauser
|
|
|
03/04/96 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NEED TO REVENT RANGE HOODS
|
INSP - Rough-in & Gas Pressure | 1/5/1996 | 1/5/1996 | 1/5/1996 | P | PASS |
Alan Hauser
|
|
|
01/05/96 350 - BUILDING B 8 EACH OF VENT FURNACE GAS TEST HOOD GAS PIPING OK PRESSURE TEST OK FOR ALL 8 TEST LEFT TAGS WITH JAMES FROM HOMEPRO AS COU GET TO THE METER LOCATION.#29984,985,986,987,9
|