INSP - Final | 3/25/1996 | 3/26/1996 | 3/26/1996 | A | PASS |
Dave Lightfoot
|
|
|
03/25/96 337 - FNL -OK FINAL SIGN PERM OCC CARD
|
INSP - Final | 3/25/1996 | 3/26/1996 | 3/26/1996 | A | PASS |
Dave Lightfoot
|
|
|
03/25/96 337 - FNL -OK FINAL SIGN PERM OCC CARD
|
INSP - Final | 3/22/1996 | 3/25/1996 | 3/26/1996 | A | PASS |
Dave Lightfoot
|
|
|
03/22/96 337 - AS SOON AS POSSIBLE FNL -OK FINAL SIGN PERM OCC CARD
|
INSP - Final | 3/22/1996 | 3/25/1996 | 3/26/1996 | A | PASS |
Dave Lightfoot
|
|
|
03/22/96 337 - AS SOON AS POSSIBLE FNL -OK FINAL SIGN PERM OCC CARD
|
INSP - Final | 3/20/1996 | 3/20/1996 | 3/20/1996 | P | FAIL |
Dave Lightfoot
|
|
|
03/20/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 3/20/1996 | 3/20/1996 | 3/20/1996 | P | FAIL |
Dave Lightfoot
|
|
|
03/20/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Gas pressure test | 3/19/1996 | 3/20/1996 | 3/20/1996 | A | PASS |
Dave Lightfoot
|
|
|
03/19/96 337 - GP -OK GAS PIPING
|
INSP - Framing/ Rough-in | 2/1/1996 | 2/1/1996 | 2/1/1996 | P | PASS |
Dave Lightfoot
|
|
|
02/01/96 337 - RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 1/25/1996 | 1/26/1996 | 1/26/1996 | A | FAIL |
Dave Lightfoot
|
|
|
01/25/96 337 - R\I REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 1/22/1996 | 1/23/1996 | 1/23/1996 | A | FAIL |
Dave Lightfoot
|
|
|
01/22/96 337 - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 1/16/1996 | 1/17/1996 | 1/17/1996 | A | NH |
Dave Lightfoot
|
|
|
01/16/96 337 - INSTALLED 2 UNITS HEATERS, GAS PIPING, VENTING AND INSTAL UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|