INSP - Final | 3/6/1996 | 3/6/1996 | 3/6/1996 | P | NR |
Carl Dependahl
|
|
|
03/06/96 340 - FINAL
|
INSP - Final | 3/6/1996 | 3/6/1996 | 3/6/1996 | P | NR |
Carl Dependahl
|
|
|
03/06/96 340 - FINAL
|
INSP - Framing/ Rough-in | 2/5/1996 | 2/5/1996 | 2/5/1996 | P | PASS |
Carl Dependahl
|
|
|
02/05/96 340 - R/I ONLY, STUART HAD CORRECTIONS..THEY WERE TO EXTEND COMB. AIR DUCTS TO FURN AND WH AREAS.
|
INSP - Framing/ Rough-in | 2/2/1996 | 2/2/1996 | 2/5/1996 | P | CANC |
|
|
|
REINSPECTON STUART NOT HERE, SO I SENT IT TO CARL
|
INSP - Rough-in & Gas Pressure | 2/1/1996 | 2/1/1996 | 2/1/1996 | P | PART |
|
|
|
02/01/96 326 - THIS ONE GOT MISSED SOME HOW YOU WERE SENT IT ON THE 1-22 BUT YOU CANC. Gas Test done - maybe by Alan. R/I correction: extend comb. air ducts to Furnace / WH area.
|
INSP - Rough-in & Gas Pressure | 1/19/1996 | 1/19/1996 | 1/22/1996 | P | CANC |
|
|
|
01/22/96 326 - To be done by Alan.
|