INSP - Final | 5/1/1996 | 5/2/1996 | 5/2/1996 | P | FAIL |
Dave Lightfoot
|
|
|
05/02/96 337 - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED INSULATE PLENUM IN CRAWL R/6
|
INSP - Final | 5/1/1996 | 5/2/1996 | 5/2/1996 | P | FAIL |
Dave Lightfoot
|
|
|
05/02/96 337 - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED INSULATE PLENUM IN CRAWL R/6
|
INSP - Final | 5/2/1996 | 5/2/1996 | 5/2/1996 | P | FAIL |
Dave Lightfoot
|
|
|
05/02/96 337 - KEY OVER MAN DOOR TO GARAGE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED INSULATE PLENUM R/6 IN CRAWL
|
INSP - Final | 5/2/1996 | 5/2/1996 | 5/2/1996 | P | FAIL |
Dave Lightfoot
|
|
|
05/02/96 337 - KEY OVER MAN DOOR TO GARAGE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED INSULATE PLENUM R/6 IN CRAWL
|
INSP - Final | 4/12/1996 | 4/15/1996 | 4/15/1996 | A | NH |
Dave Lightfoot
|
|
|
04/12/96 337 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Final | 4/12/1996 | 4/15/1996 | 4/15/1996 | A | NH |
Dave Lightfoot
|
|
|
04/12/96 337 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Framing/ Rough-in | 2/14/1996 | 2/15/1996 | 2/15/1996 | A | CANC |
Dave Lightfoot
|
|
|
02/14/96 337 - REINSPECTION BY INSPECTOR 400
|
INSP - Rough-in & Gas Pressure | 2/15/1996 | 2/15/1996 | 2/15/1996 | P | PASS |
|
|
|
|
INSP - Rough-in & Gas Pressure | 2/15/1996 | 2/15/1996 | 2/15/1996 | A | FAIL |
|
|
|
|
INSP - Framing/ Rough-in | 2/9/1996 | 2/12/1996 | 2/12/1996 | A | FAIL |
Dave Lightfoot
|
|
|
02/09/96 337 - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED BOX VENT IN NEED FIRE STOP AT ATTIC FOR VENT AND FA DUCT TAPE FA SEAMS
|
INSP - Gas pressure test | 2/6/1996 | 2/7/1996 | 2/7/1996 | A | PASS |
Dave Lightfoot
|
|
|
02/06/96 337 - GP -OK GAS PIPING
|