INSP - Final | 5/10/1996 | 5/13/1996 | 5/13/1996 | A | PASS |
Dave Lightfoot
|
|
|
05/10/96 337 - FNL -OK FINAL
|
INSP - Final | 5/10/1996 | 5/13/1996 | 5/13/1996 | A | PASS |
Dave Lightfoot
|
|
|
05/10/96 337 - FNL -OK FINAL
|
INSP - Rough-in & Gas Pressure | 2/13/1996 | 2/13/1996 | 2/13/1996 | P | PASS |
Dave Lightfoot
|
|
|
02/13/96 337 - REINSPECTON RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 2/9/1996 | 2/12/1996 | 2/12/1996 | A | FAIL |
Dave Lightfoot
|
|
|
02/09/96 337 - REINSPECTION CORR-CORREC-CALL FOR REINSP WHEN COMPLETED RFC -REINSPECTION FEE CHARGED
|
INSP - Rough-in & Gas Pressure | 2/8/1996 | 2/8/1996 | 2/8/1996 | P | PART |
Dave Lightfoot
|
|
|
02/08/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PI
|