INSP - Final | 5/28/1996 | 5/29/1996 | 5/29/1996 | A | PASS |
|
|
|
05/29/96 326 - Corrections made. Final ok.
|
INSP - Final | 5/28/1996 | 5/29/1996 | 5/29/1996 | A | PASS |
|
|
|
05/29/96 326 - Corrections made. Final ok.
|
INSP - Final | 5/24/1996 | 5/24/1996 | 5/24/1996 | | FAIL |
|
|
|
/ / 326 - Not ready for Final. Corrections: extend gas piping to Range comb. air duct at furnace.
|
INSP - Final | 5/24/1996 | 5/24/1996 | 5/24/1996 | P | CANC |
Alan Hauser
|
|
|
this is 326 area
|
INSP - Final | 5/24/1996 | 5/24/1996 | 5/24/1996 | P | CANC |
Alan Hauser
|
|
|
this is 326 area
|
INSP - Final | 5/24/1996 | 5/24/1996 | 5/24/1996 | | FAIL |
|
|
|
/ / 326 - Not ready for Final. Corrections: extend gas piping to Range comb. air duct at furnace.
|
INSP - Final | 5/14/1996 | 5/14/1996 | 5/14/1996 | P | NR |
|
|
|
05/14/96 326 - Not ready. WH not set / vented.
|
INSP - Final | 5/14/1996 | 5/14/1996 | 5/14/1996 | P | NR |
|
|
|
05/14/96 326 - Not ready. WH not set / vented.
|
INSP - Gas pressure test | 5/2/1996 | 5/3/1996 | 5/3/1996 | A | PASS |
|
|
|
05/03/96 326 - Gas Test ok - Tag #28352.
|
INSP - Gas log/ Fireplace | 2/14/1996 | 2/14/1996 | 2/14/1996 | P | PASS |
Carl Dependahl
|
|
|
BASIC 4 GAS LOG PASSED AS PER CARL
|
INSP - Rough-in & Gas Pressure | 2/14/1996 | 2/14/1996 | 2/14/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 -
|