INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 | A | PASS |
Dave Lightfoot
|
|
|
09/18/96 337 - YOU NEED TO SIGN THE OCC PERM CARD AS PER XENON FNL -OK FINAL
|
INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 | A | PASS |
Dave Lightfoot
|
|
|
09/18/96 337 - YOU NEED TO SIGN THE OCC PERM CARD AS PER XENON FNL -OK FINAL
|
INSP - Final | 7/25/1996 | 7/26/1996 | 7/26/1996 | A | PASS |
Dave Lightfoot
|
|
|
07/26/96 337 - BLD 24 FAB 4-PHASE 2 SIGN TEMP OCC
|
INSP - Final | 7/25/1996 | 7/26/1996 | 7/26/1996 | A | PASS |
Dave Lightfoot
|
|
|
07/26/96 337 - BLD 24 FAB 4-PHASE 2 SIGN TEMP OCC
|
INSP - Final | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | CANC |
Dave Lightfoot
|
|
|
07/25/96 337 - INSPECTION TO BE DONE THE 26TH
|
INSP - Final | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | CANC |
Dave Lightfoot
|
|
|
07/25/96 337 - INSPECTION TO BE DONE THE 26TH
|
INSP - Final | 7/11/1996 | 7/11/1996 | 7/11/1996 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FRAM-OK FRAMING bldg 24 need to set roof top unit and process pipe inspection
|
INSP - Final | 7/10/1996 | 7/11/1996 | 7/10/1996 | A | CANC |
Dave Lightfoot
|
|
|
07/10/96 337 - #24 FAB 4 YOU'VE BEEN OUT THERE ON THE R/I this inspection to be done the 11th
|
INSP - Final | 7/10/1996 | 7/11/1996 | 7/10/1996 | A | CANC |
Dave Lightfoot
|
|
|
07/10/96 337 - #24 FAB 4 YOU'VE BEEN OUT THERE ON THE R/I this inspection to be done the 11th
|
INSP - Framing/ Rough-in | 4/18/1996 | 4/19/1996 | 4/19/1996 | A | PASS |
Dave Lightfoot
|
|
|
04/18/96 337 - FAB 4 BLD 24 - DRYSIDE MECHANICAL R/I CONTACT: JERRY HARD IS FOR AM FRIDAY PARTIAL R/I OK
|