INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 | A | PASS |
Dave Lightfoot
|
|
|
09/18/96 337 - CONTACT XENON ###-#### 99109 X GARDIAN AREA FAB 4 PHASE I FNL -OK FINAL
|
INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 | A | PASS |
Dave Lightfoot
|
|
|
09/18/96 337 - CONTACT XENON ###-#### 99109 X GARDIAN AREA FAB 4 PHASE I FNL -OK FINAL
|
INSP - Final | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | |
Dave Lightfoot
|
|
|
GARDEN AREA OF 24
|
INSP - Final | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | |
Dave Lightfoot
|
|
|
GARDEN AREA OF 24
|
INSP - Framing/ Rough-in | 7/11/1996 | 7/11/1996 | 7/11/1996 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - bldg 24 gardian job RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 7/10/1996 | 7/11/1996 | 7/10/1996 | A | CANC |
Dave Lightfoot
|
|
|
07/10/96 337 - #24 AREA SOUTH EAST CORNER-CONTACT: ZENON LONG ###-####-F PLATFORM this inspection to be done the 11th
|