INSP - Final | 6/17/1996 | 6/17/1996 | 6/17/1996 | P | PASS |
Alan Hauser
|
|
|
06/17/96 350 - all corrections taken care of final
|
INSP - Final | 6/17/1996 | 6/17/1996 | 6/17/1996 | P | PASS |
Alan Hauser
|
|
|
06/17/96 350 - all corrections taken care of final
|
INSP - Partial final | 4/18/1996 | 4/19/1996 | 4/19/1996 | A | PART |
Alan Hauser
|
|
|
04/18/96 350 - SIGNED THE TEMP. OCCUPANCY CARD AND WENT OVER WHAT THEY N UPPER COMB.-AIR
|
INSP - Framing/ Rough-in | 3/20/1996 | 3/22/1996 | 3/22/1996 | P | CANC |
|
|
|
THIS IS FOR THE BASEMENT PARTIAL R/I STUART SICK..SENT TO DAVE L
|
INSP - Framing/ Rough-in | 3/21/1996 | 3/22/1996 | 3/22/1996 | A | PART |
Dave Lightfoot
|
|
|
PARTIAL R/I ON BASEMENT partial ok as per dlightfoot
|
INSP - Framing/ Rough-in | 3/4/1996 | 3/5/1996 | 3/5/1996 | P | PART |
Alan Hauser
|
|
|
03/04/96 350 - ROUGH-IN IS OK FOR ONLY THE UPSTAIRS, ALSO NEED DRAWING OF HOW THEY ARE TO GET COMB.-AIR TO BASEMENT MECH. ROOM.
|