INSP - Final | 9/18/1996 | 9/19/1996 | 9/19/1996 | A | PASS |
Alan Hauser
|
|
|
09/19/96 350 - RE-INSPECTION FINAL ì
|
INSP - Final | 9/18/1996 | 9/19/1996 | 9/19/1996 | A | PASS |
Alan Hauser
|
|
|
09/19/96 350 - RE-INSPECTION FINAL ì
|
INSP - Final | 9/18/1996 | 9/18/1996 | 9/18/1996 | P | PASS |
Alan Hauser
|
|
|
09/18/96 350 - call from dan woolston, said owner had own hoods for rang here for two weeks, said would final mech. and look at them on final. fi
|
INSP - Final | 9/18/1996 | 9/18/1996 | 9/18/1996 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - corrections, support gas pipe at furn. and finish rangehoods
|
INSP - Final | 9/18/1996 | 9/18/1996 | 9/18/1996 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - corrections, support gas pipe at furn. and finish rangehoods
|
INSP - Final | 9/18/1996 | 9/18/1996 | 9/18/1996 | P | PASS |
Alan Hauser
|
|
|
09/18/96 350 - call from dan woolston, said owner had own hoods for rang here for two weeks, said would final mech. and look at them on final. fi
|
INSP - Final | 9/17/1996 | 9/17/1996 | 9/17/1996 | P | NR |
Alan Hauser
|
|
|
09/17/96 350 - LATE AS POSSIBLE NOT READY
|
INSP - Final | 9/17/1996 | 9/17/1996 | 9/17/1996 | P | NR |
Alan Hauser
|
|
|
09/17/96 350 - LATE AS POSSIBLE NOT READY
|
INSP - Framing/ Rough-in | 3/14/1996 | 3/14/1996 | 3/14/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ROUGH-IN IS OK
|
INSP - Gas pressure test | 3/14/1996 | 3/14/1996 | 3/14/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - GAS PIPING OK #29319
|
INSP - Rough-in & Gas Pressure | 3/14/1996 | 3/14/1996 | 3/14/1996 | P | CANC |
Jim Sly
|
|
|
03/14/96 316 - Swamped....Gave to Alan H.
|
INSP - Rough-in & Gas Pressure | 3/13/1996 | 3/13/1996 | 3/13/1996 | P | NR |
Jim Sly
|
|
|
03/13/96 316 - NR
|