INSP - Final | 5/30/1996 | 5/30/1996 | 5/30/1996 | P | PASS |
Alan Hauser
|
|
|
MEC. FINAL OK ALSO BLD FINAL WAS OK SIGNED AND LEFT LETTER OF COMPLIANCE WITH BUILDER.
|
INSP - Final | 5/30/1996 | 5/30/1996 | 5/30/1996 | P | PASS |
Alan Hauser
|
|
|
MEC. FINAL OK ALSO BLD FINAL WAS OK SIGNED AND LEFT LETTER OF COMPLIANCE WITH BUILDER.
|
INSP - Final | 5/22/1996 | 5/23/1996 | 5/23/1996 | A | FAIL |
Jim Sly
|
|
|
05/22/96 316 - C/N ...B vent clearance, secure 3" vent above water heate wrap boots and connections.
|
INSP - Final | 5/22/1996 | 5/23/1996 | 5/23/1996 | A | FAIL |
Jim Sly
|
|
|
05/22/96 316 - C/N ...B vent clearance, secure 3" vent above water heate wrap boots and connections.
|
INSP - Rough-in & Gas Pressure | 3/19/1996 | 3/20/1996 | 3/20/1996 | A | PASS |
Jim Sly
|
|
|
03/19/96 316 - Tag #028499
|