INSP-Final | | | 5/22/1996 | | PASS |
|
|
|
corrections made final ok
|
INSP - Final | 5/20/1996 | 5/20/1996 | 5/20/1996 | P | CANC |
Jim Sly
|
|
|
/ / 316 - done by 350
|
INSP - Final | 5/20/1996 | 5/20/1996 | 5/20/1996 | P | CANC |
Jim Sly
|
|
|
/ / 316 - done by 350
|
INSP - Gas pressure test | 3/27/1996 | 3/27/1996 | 3/27/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Gas pressure test OK.
|
INSP - Rough-in & Gas Pressure | 3/27/1996 | 3/27/1996 | 3/27/1996 | P | PART |
Jim Sly
|
|
|
03/27/96 316 - R.I. OK......Gas pressure fail.
|
INSP - Rough-in & Gas Pressure | 3/21/1996 | 3/22/1996 | 3/22/1996 | P | NR |
Jim Sly
|
|
|
03/21/96 316 - Not Ready
|