HEATING AND COOLING EAUIPMENT FOR COMMON AREAS, BATHROOM EXHAUST, DUCTWORK POOL DEHUMIDIFICATION. CERT. OF VALUE ON FILE OF 232316.00 THIS IS THE TOTAL VALUE FOR ALL BUILDINGS. EACH BUILDING WILL HAVE ITS OWN PERMIT. AND 10.00 EACH. OK PER GS/JT/LH 3/26/96-DO NOT NEED TO TAKE 3 PERMITS OUT ON THIS. THIS IS ONE BUILDING.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final1/14/19971/14/19971/14/1997PPASS
DetailsAlan Hauser
01/14/97 350 - SIGN OFF CARD IS ON CATHYS DESK will sign card wednesday
INSP - Final1/14/19971/14/19971/14/1997PPASS
DetailsAlan Hauser
01/14/97 350 - SIGN OFF CARD IS ON CATHYS DESK will sign card wednesday
INSP - Final10/3/199610/4/199610/4/1996APART
DetailsAlan Hauser
10/04/96 350 - SIGNED TEMP OCC, STILL HAVE CORRECTIONS, COMB.-AIR POOL R GASLINE IN POOL ROOM
INSP - Final10/3/199610/4/199610/4/1996APART
DetailsAlan Hauser
10/04/96 350 - SIGNED TEMP OCC, STILL HAVE CORRECTIONS, COMB.-AIR POOL R GASLINE IN POOL ROOM
INSP - Final8/20/19968/21/19968/21/1996APART
DetailsAlan Hauser
08/21/96 350 - MARRIOT- AREA A-LOBBY SIGNED TEMP. FOR LOBBY, STILL NEED PRESSURE TEST ON GASLINE AND DRAWING
INSP - Final8/20/19968/21/19968/21/1996APART
DetailsAlan Hauser
08/21/96 350 - MARRIOT- AREA A-LOBBY SIGNED TEMP. FOR LOBBY, STILL NEED PRESSURE TEST ON GASLINE AND DRAWING
INSP - Framing/ Rough-in6/25/19966/25/19966/25/1996PPASS
DetailsAlan Hauser
06/25/96 350 - 3RD FLOOR AREA C/ BATHROOM FANS/ DEBBIE SAID YOU WOULD DO BATH FANS OK
INSP - Framing/ Rough-in6/21/19966/21/19966/21/1996 PASS
DetailsAlan Hauser
/ / 350 - R/I OK FOR BATH FANS IN C-4
INSP - Framing/ Rough-in6/5/19966/5/19966/5/1996 PASS
DetailsAlan Hauser
/ / 350 - ALL FANS ON THIRD FLOOR OF NORTH WING OK
INSP - Framing/ Rough-in6/3/19966/3/19966/3/1996 PASS
DetailsAlan Hauser
/ / 350 - r/i ok for 4th floor ceilings in the north wing signed sign-
INSP - Framing/ Rough-in5/24/19965/24/19965/24/1996 PASS
ok to cover b-1 all fans hooked up
INSP - Framing/ Rough-in5/22/19965/22/19965/22/1996 PART
partial r/i for b-1 1st floor rooms north side
INSP - Conference5/17/19965/16/19965/16/1996 PASS
looked at duct in attic above 4th floor and at exhaust duct in kitchen, talked to robin
INSP - Conference5/15/19965/15/19965/15/1996 PART
DetailsAlan Hauser
/ / 350 - conf. with robin from creamer
INSP - Hoods4/19/19964/19/19964/19/1996 PART
DetailsAlan Hauser
/ / 350 - LOOKED AT EXHAUST DUCT DOWN FROM ROOF INSIDE SHAFT. DUCT WA
INSP - Framing/ Rough-in4/9/19964/9/19964/9/1996 PART
DetailsAlan Hauser
/ / 350 - CONFERENCE WITH ROBIN FROM CREAMER HEATING, WENT OVER THREE UNITS IN ATT SPACE IN BUILDING A, AND TALKED ABOUT EQUIPMENT IN KITCHEN.